A 100kVA generator set is one of the common medium-sized diesel generator sets available in the UAE. This generator is large enough to provide backup for a small commercial structure, workshop or a number of site cabins, but not too large to be located in a canopy erected on a small plinth. Taking the common power factor of 0.8, a 100kVA is equivalent to around 80kW.
Whether this is the appropriate size depends on the load connected to it, its starting method and run time. This article will outline the capacity of the 100kVA generator set, ratings, fuel consumption, factors that affect cost and some models of generator sets provided by GENAVCO (GPS and Green Power).
| Key facts | Detail |
| Real power | About 80 kW at 0.8 power factor |
| Typical supply | Three phase for most buildings and plant, with single phase loads spread across the phases |
| Fuel use at 75% load | Roughly 16 to 20 litres an hour as a planning estimate |
| GENAVCO options | GPS Industrial Range, GPS standard range and Green Power 1500 rpm sets |
What can a 100 kVA generator run?
From the load schedule rather than one overall figure; see our guide on kVA and electrical output for an explanation of how kW and kVA should not be interchanged, and why motor starting is as important as load operation. The general guideline is that 80 kW is sufficient to cover the following:
- A small office or retail building: lighting, small power, lifts on a staggered start and part of the air conditioning.
- A workshop: lighting, hand tools, a compressor and a few motors, provided they do not all start at once.
- Site set-up: cabins, welfare units, lighting and small plant on a construction site.
- Pumping: a pump station or dewatering duty within the set's motor starting capability.
Direct online motors have starting currents that are many times greater than their operating currents, hence one big motor will determine the rating rather than the total load. Our comprehensive guide to help you select the right generator size includes this information.
Which size of set fits your load?
| If your running load is... | Consider | Why |
| Under about 55 kW with small motors | A smaller set than 100 kVA | A 100 kVA set would run lightly loaded much of the time |
| About 55 to 70 kW with a sensible margin | 100 kVA | Leaves headroom for starting surges and some growth |
| Close to 80 kW, or large motors starting | A bigger set, or two sets | Running at the limit shortens life and dips voltage on starts |
| Several hundred kW | A large set such as 500 kVA, or synchronised sets | Different engine class and installation scale |
Overloading is not acceptable to the diesel sets for prolonged times, hence oversizing is an unnecessary expense rather than an insurance measure. Likewise, a diesel set that operates at full capacity every afternoon during July faces difficulties since production is hindered by increased temperatures.
Should you buy a prime or standby rating?
Standby sets cover mains failures for limited hours. Prime sets run as the main supply for unlimited hours on a varying load. The same machine carries a lower prime figure than standby figure, so compare quotes on the same rating. The rating for prime is required at places without electricity, whereas the standby with ATS is required for offices with a dependable supply of electricity in the building.
What should you check before you buy a 100 kVA generator?
- Basis for Rating. Clarify 100 kVA is either standby or prime rating at what power factor.
- Phase, Voltage and Frequency. Three phase and 50 Hz are suitable for majority of buildings in UAE. Clarify before placing an order as change is quite difficult afterwards.
- Canopy and silencer. Match the silencer grade to neighbours and any noise limit at the boundary. See our silent generator guide.
- The fuel tank run time and any additional tank needed.
- Controlling and communication. Decide early on how to connect or synchronize the system through ATS, BMS and any other control needed.
- Heating and dust considerations. Inquire what is the performance of the engine at the UAE summer temperatures and cleaning facilities of filter and radiator.
- Availability of spares and servicing.
What shapes the price of a 100 kVA generator?
Two sets with the same nameplate can sit far apart on price. The main differences are:
- Brand names of engines and alternators and if the unit operates at 1500 RPM to increase longevity while operating continuously.
- Grade of canopy and silencer: medical and domestic silencers have higher prices compared to the industrial grade.
- Capacity of the fuel tank: bigger fuel tanks make units costly and increase operating hours.
- Controls: ATS and BMS ready-to-connect and synchronize panels.
- Scope of installation: base, cable wiring, changeover, and exhaust.
- Unit availability: units from stock reduce lead times.
Ask for a quote that lists all of these, so you are comparing the same scope rather than the lowest headline figure.
Which GENAVCO models fit?
GENAVCO supplies GPS and Green Power generating sets that cover 100 kVA comfortably within their ranges.
| GPS Industrial Range | |
| Range: 10 to 2,500 kVA
Enclosure: closed canopy for sound attenuation Silencer options: hospital, residential and industrial grade Frequency: 50 Hz or 60 Hz Fuel: built-in tanks, with option for external tanks Controls: programmable panels, compatible with BMS, ATS and synchronisation |
|
| Best for: Buildings and plants that want a canopied set with full control integration | |
The GPS standard range runs from 5 kVA to 3,000 kVA, with standard stock sets that can help when time is short. To compare options, request a 100 kVA generator quote with your load list, or see the wider range of GPS power generators.
What does a 100 kVA generator cost to run?
Fuel and maintenance make up most of the lifetime cost. When considering estimation purposes, diesel generator consumes 0.25 – 0.3 liters of fuel per kWh when operated under medium to high loads. With that, 15 – 18 liters of diesel is needed per hour of operation of 100 Kva diesel generator operating at 75% load; however, according to industry fuel tables, 16 – 20 liters per hour is needed per diesel generator.
- Service intervals: oil, filters and coolant on the maker's schedule, more often in dust.
- Light loading: run a standby set under real load from time to time to avoid deposits.
- Battery and fuel checks: a flat battery is the most common reason a set fails to start, and stale or contaminated fuel is another.
GENAVCO supports GPS sets with installation, maintenance and genuine parts through certified technicians and onsite service vans. Our diesel generator guide covers running in UAE heat in more depth.
Common questions
How many kW is a 100 kVA generator?
About 80 kW, based on the standard 0.8 power factor used to rate generating sets.
How much fuel does a 100 kVA generator use per hour?
Roughly 16 to 20 litres an hour at 75% load, as an estimate. Use the engine maker's fuel table for budgets.
Is a 100 kVA generator three phase?
Most sets of this size are three phase. Single phase loads should be spread evenly across the three phases.
Is a 100 kVA generator able to power a villa?
Yes, but the villa’s consumption is lower than that for many other villas. Take into account the actual load list, particularly air conditioners, before selecting 100 kVA.
What determines the cost of a 100 kVA generator?
Engine and alternator, canopy and silencer quality, fuel tank, control panel and scope of installation works.
Submit your load list to us, and we shall help determine the best size 100 kVA generator to suit your needs.
Serving Dubai, Abu Dhabi, Sharjah, Al Ain and the wider UAE.
REQUEST A 100 KVA GENERATOR QUOTE